Electrical deck work

Top-down view of labelled white electrical conduits ending at red cast-in boxes on slab formwork under steel reinforcement

Why we lay conduit in the slab before the concrete is poured.

Electrical deck work is laying electrical conduit and cast-in boxes on the formwork deck, among the reinforcing steel, before the concrete slab is poured. Once the concrete goes in, those conduits are set permanently in the structure, and we pull the cables through them later. Many electricians skip this step when a false ceiling will sit below the slab. Hills Electrical, a third-generation family business based in Roseville since 1948, does it as standard on concrete homes across the North Shore.

What electrical deck work involves

On the deck, we set out every conduit run and cast-in box from the electrical plans, fix them in place among the steel, and label each run with the circuit it will carry, such as kitchen power, cooktop, oven, air conditioning or a car charger. It is normally a couple of days on the deck for each pour, and it is finished before the concrete truck arrives.

Keeping ceiling and bulkhead space clear

Architects, builders and designers work hard to achieve the greatest possible ceiling height, in large homes and smaller spaces alike. That is good for the finished home, but it reduces the space in the ceiling and bulkheads. Mechanical services such as air conditioning, plumbing and electrical all need room in that same space.

With our conduit set in the slab, the electrical runs are no longer competing for it. That leaves more room for the other services and helps every trade maintain the minimum clearances the work requires. On a custom home, the slab deck is the moment to lay conduit, before the pour, so the routes are set and the ceiling and bulkhead space stays clear.

Wide view of a dense network of grey electrical conduit tied into reinforcement mesh on a formwork deck
Once this slab is poured, these runs are in the concrete, not competing for ceiling and bulkhead space.

When deck work is the only option

Board-formed concrete ceiling with a row of cast-in downlight boxes and orange conduit boxes, with water views through the scaffold
A board-formed concrete ceiling at Palm Beach: every downlight box and conduit was set in the slab before the pour, because there’s nowhere else for it to go.

On some homes, deck work is not optional. Architectural homes with off-form concrete ceilings, such as our current projects at Palm Beach, have no ceiling space at all. If the conduit is not in the slab before the pour, there is nowhere else for it to go.

We also carry out deck work on homes in Gordon and elsewhere on the North Shore, even where a ceiling could conceal the cables. Doing it consistently means our team has the experience to complete it efficiently and well when a home depends on it.

A neater, faster rough-in

Capped white conduit risers with handwritten circuit labels standing up from slab reinforcement
Risers labelled and capped at the deck, so rough-in starts exactly where the plans say.

Deck work is time invested early, and it is returned at rough-in. With the main runs already in the slab, the rough-in is neater and faster. Rough-ins on large concrete homes are demanding, and our team arrives better prepared and finishes stronger.

Working with the site team

Deck work depends on close cooperation with the concreters, steel fixers, formworkers and site foreman. Working alongside them on the deck builds good relationships on site, and it deepens our team’s understanding of how these homes are built.

Electricians in Hills Electrical shirts on a yellow formwork deck covered in conduit at dusk, with a crane behind
Our team on the deck at Palm Beach, working alongside the formwork and steel crews before the pour.

Knowing the project earlier

Conduit runs fanning out to a row of orange cast-in boxes on a reinforced slab deck before the pour
Every box position set out on the deck in Gordon, weeks before the walls go up.

We often price a project months before we start on site, sometimes eight months. Deck work brings us into the project much earlier and more often. We understand the plans sooner, review the detail more closely, and stay consistent from the slab through to fit-off. It is part of the design and construct approach we bring to architectural and custom homes.

Frequently asked questions

What is electrical deck work?

It is laying electrical conduit and cast-in boxes on the formwork deck, among the reinforcing steel, before the concrete slab is poured. Cables are pulled through the conduit later.

Why do deck work if there will be a false ceiling?

Ceiling and bulkhead space is shared by air conditioning, plumbing and electrical. Setting our conduit in the slab frees that space, helps every trade meet the required clearances, and makes the rough-in neater and faster.

When does deck work happen?

Before the concrete pour, while the formwork and steel are in place. It is normally a couple of days on the deck for each pour, coordinated with the concreters, steel fixers and formworkers.

Is the cable laid in the concrete?

No. We lay conduit and cast-in boxes in the slab. The cables are pulled through the conduit later, during rough-in.

Do you carry out deck work on the North Shore?

Yes. We carry out electrical deck work on concrete homes across Roseville, Wahroonga, Warrawee, St Ives, Turramurra, Lindfield, Killara, Pymble, Mosman, Balmoral, Terrey Hills and Beecroft.